BOT PPP urban infrastructure project evaluation methods of social research.pdf
BOT / PPP Page 1
Zhao Guofu, Shou Qing, urban infrastructure BOT / PPP project evaluation methods of social research, "economic construction", in December 2006 special issue, pages 113-116
urban infrastructure
BOT / PPP
community projects Evaluation
1
Zhao Guofu
2
Shou Qing
3
(construction and management of the Department of Tsinghua University, Beijing 100084)
Abstract: BOT project finance model since its birth,Caused the private sector and public sector attention.
to be an important mode of financing, BOT / PPP model for infrastructure construction in the process of financial pressure on the government to introduce
foreign investment and promote private capital investment and efficiency in such areas as a great advantage.At present, the BOT / PPP project research study
been largely confined to the financial evaluation, risk analysis, the BOT / PPP project is still in the initial evaluation of the social order
paragraph. In this paper, the original social project evaluation on the basis of the combination of BOT / PPP project to introduce the characteristics of the development of relatively mature
AHP, to adapt to the establishment of BOT / PPP project evaluation of the social benefits of the method,With a view to clearly understand the
BOT / PPP projects of social benefits.
keyword: BOT / PPP, social assessment, evaluation methods, AHP, urban infrastructure projects in China
social evaluation is based mainly on the State Planning Commission, Ministry of Construction and Investment Institute of Standards Division of the fixed
" Social investment project evaluation guide "as defined in several ways,That is, quantitative and qualitative analysis to
law, any comparison analysis, logical framework analysis, interest groups analysis, a comprehensive analysis of the evaluation method [
1
]. This methodology
several social projects in the evaluation process played a very good guide, but as the complexity of the project,
, as well as the size of the new projects are emerging, especially in BOT / PPP projects, the traditional evaluation methods
no longer be able to meet the need.
and general corporate finance projects in comparison, BOT / PPP model for infrastructure construction in the area, the city
play a crucial role in development. In view of the BOT / PPP project characteristics, that is, investment in large-scale, long cycle, the use of pricing
, the affected groups, government finance, attract foreign investment and private capital to promote economic development, accelerate infrastructure construction
-and co-ordinated Difficult and high-risk,The need to explore ways to improve existing methods of evaluation of social benefits,
an objective and comprehensive evaluation of the BOT / PPP project characteristics. This article will be the introduction of AHP to improve the current social
evaluation methods.
1. BOT / PPP project
according to the characteristics of Tsinghua University Professor Wang Shouqing on the BOT project risk research [
2
], is summed up BOT projects
special points are as follows:
1.1, the investment scale, long
1
this project for the National Natural Science Foundation of the project [PPP / BOT projects to improve the financial evaluation and risk analysis applications], its application: G0112
evaluation of the theory and technology; G0114 number of economic Analysis of the theory and methodology
2
Zhao Guofu, male, Han nationality, born in January 1982,Tsinghua University construction management science and engineering graduate students. 2002
admitted to the Civil Engineering Department of Tsinghua University, in 2004 transferred to the Department of Construction Management, Tsinghua graduate students sent in 2006, where she studied with Professor Wang Shouqing financing research projects (BOT / PPP / PFI)
Address: 7 Tsinghua University student apartment building 140 Room, Zip code: 100084, Email: nationppp @ 163.com, 010-62775691 (h), 010-62796834 (o),
13811781143 (m)
3
Dr. Wang Shouqing / Professor / Doctor Advisor, Tsinghua University, Beijing 100084 Soil Water Management Institute building / Qinghua University International Project Management Institute Deputy Director of the Department of
. Tel: 62788036,62781511 (Secretary), Fax: 62773661, e-mail: sqwang@tsinghua.edu.cn
Page 2
Zhao Guofu, Shou Qing, urban infrastructure BOT / PPP project evaluation methods of social research, "building the economy", December 2006 Special Issue, pages 113-116
of the main features of the project sponsors from the point of view,Because the scale of investment, a long cycle of the project was launched
people, is a huge challenge, is also a sponsor of the financing ability, capacity building, operation and management of a comprehensive assessment
.
1.2, the use of the high prices of the affected population is characterized by large
from the BOT / PPP projects that users of the public's point of view. Infrastructure and public work and lives
,Therefore, charges or fees, as well as the impact of high and low prices of a huge, the Government has the responsibility
at reasonable prices or even free for the public to meet infrastructure needs. BOT / PPP model is the infrastructure of the concession granted by the private
charge a fixed fee to recover costs and earn profits, which means that with the direct investment in the construction phase
than the public pay a higher price to Access to infrastructure. Therefore,The public is important stakeholder groups,
their behavior on the impact of a huge project.
1.3, government finance, attract foreign investment and private capital
characterized by the government's point of view, BOT / PPP model to a large extent depend on the introduction of the Government's attitude and financial
. Through the introduction of foreign investment and private capital for infrastructure construction in the Government's lack of funds to effectively alleviate the situation
solution,The Government will have more energy funds will be invested in more areas. At the same time, foreign investment and private capital
involved in the process of project management of the country's level of technical capacity, management and so on will be very
put up.
1.4, the promotion of economic development, accelerate infrastructure construction
characterized by the level of national, BOT / PPP projects related to the industry's huge driving force,
through the participation of private capital access to infrastructure construction and speed up the effective operation is the BOT / PPP. BOT / PPP model of the introduction of
greatly to mobilize social capital, full of various consortia and contractors to enhance the enthusiasm, making the project participants to
common goal together, through the effective allocation of resources and effective risk-sharing Increased resources for the benefit
Zhao Guofu, Shou Qing, urban infrastructure BOT / PPP project evaluation methods of social research, "economic construction", in December 2006 special issue, pages 113-116
urban infrastructure
BOT / PPP
community projects Evaluation
1
Zhao Guofu
2
Shou Qing
3
(construction and management of the Department of Tsinghua University, Beijing 100084)
Abstract: BOT project finance model since its birth,Caused the private sector and public sector attention.
to be an important mode of financing, BOT / PPP model for infrastructure construction in the process of financial pressure on the government to introduce
foreign investment and promote private capital investment and efficiency in such areas as a great advantage.At present, the BOT / PPP project research study
been largely confined to the financial evaluation, risk analysis, the BOT / PPP project is still in the initial evaluation of the social order
paragraph. In this paper, the original social project evaluation on the basis of the combination of BOT / PPP project to introduce the characteristics of the development of relatively mature
AHP, to adapt to the establishment of BOT / PPP project evaluation of the social benefits of the method,With a view to clearly understand the
BOT / PPP projects of social benefits.
keyword: BOT / PPP, social assessment, evaluation methods, AHP, urban infrastructure projects in China
social evaluation is based mainly on the State Planning Commission, Ministry of Construction and Investment Institute of Standards Division of the fixed
" Social investment project evaluation guide "as defined in several ways,That is, quantitative and qualitative analysis to
law, any comparison analysis, logical framework analysis, interest groups analysis, a comprehensive analysis of the evaluation method [
1
]. This methodology
several social projects in the evaluation process played a very good guide, but as the complexity of the project,
, as well as the size of the new projects are emerging, especially in BOT / PPP projects, the traditional evaluation methods
no longer be able to meet the need.
and general corporate finance projects in comparison, BOT / PPP model for infrastructure construction in the area, the city
play a crucial role in development. In view of the BOT / PPP project characteristics, that is, investment in large-scale, long cycle, the use of pricing
, the affected groups, government finance, attract foreign investment and private capital to promote economic development, accelerate infrastructure construction
-and co-ordinated Difficult and high-risk,The need to explore ways to improve existing methods of evaluation of social benefits,
an objective and comprehensive evaluation of the BOT / PPP project characteristics. This article will be the introduction of AHP to improve the current social
evaluation methods.
1. BOT / PPP project
according to the characteristics of Tsinghua University Professor Wang Shouqing on the BOT project risk research [
2
], is summed up BOT projects
special points are as follows:
1.1, the investment scale, long
1
this project for the National Natural Science Foundation of the project [PPP / BOT projects to improve the financial evaluation and risk analysis applications], its application: G0112
evaluation of the theory and technology; G0114 number of economic Analysis of the theory and methodology
2
Zhao Guofu, male, Han nationality, born in January 1982,Tsinghua University construction management science and engineering graduate students. 2002
admitted to the Civil Engineering Department of Tsinghua University, in 2004 transferred to the Department of Construction Management, Tsinghua graduate students sent in 2006, where she studied with Professor Wang Shouqing financing research projects (BOT / PPP / PFI)
Address: 7 Tsinghua University student apartment building 140 Room, Zip code: 100084, Email: nationppp @ 163.com, 010-62775691 (h), 010-62796834 (o),
13811781143 (m)
3
Dr. Wang Shouqing / Professor / Doctor Advisor, Tsinghua University, Beijing 100084 Soil Water Management Institute building / Qinghua University International Project Management Institute Deputy Director of the Department of
. Tel: 62788036,62781511 (Secretary), Fax: 62773661, e-mail: sqwang@tsinghua.edu.cn
Page 2
Zhao Guofu, Shou Qing, urban infrastructure BOT / PPP project evaluation methods of social research, "building the economy", December 2006 Special Issue, pages 113-116
of the main features of the project sponsors from the point of view,Because the scale of investment, a long cycle of the project was launched
people, is a huge challenge, is also a sponsor of the financing ability, capacity building, operation and management of a comprehensive assessment
.
1.2, the use of the high prices of the affected population is characterized by large
from the BOT / PPP projects that users of the public's point of view. Infrastructure and public work and lives
,Therefore, charges or fees, as well as the impact of high and low prices of a huge, the Government has the responsibility
at reasonable prices or even free for the public to meet infrastructure needs. BOT / PPP model is the infrastructure of the concession granted by the private
charge a fixed fee to recover costs and earn profits, which means that with the direct investment in the construction phase
than the public pay a higher price to Access to infrastructure. Therefore,The public is important stakeholder groups,
their behavior on the impact of a huge project.
1.3, government finance, attract foreign investment and private capital
characterized by the government's point of view, BOT / PPP model to a large extent depend on the introduction of the Government's attitude and financial
. Through the introduction of foreign investment and private capital for infrastructure construction in the Government's lack of funds to effectively alleviate the situation
solution,The Government will have more energy funds will be invested in more areas. At the same time, foreign investment and private capital
involved in the process of project management of the country's level of technical capacity, management and so on will be very
put up.
1.4, the promotion of economic development, accelerate infrastructure construction
characterized by the level of national, BOT / PPP projects related to the industry's huge driving force,
through the participation of private capital access to infrastructure construction and speed up the effective operation is the BOT / PPP. BOT / PPP model of the introduction of
greatly to mobilize social capital, full of various consortia and contractors to enhance the enthusiasm, making the project participants to
common goal together, through the effective allocation of resources and effective risk-sharing Increased resources for the benefit
TIPS:The description of file is automatically translated by machine, we do not guarantee the accuracy of machine translation,so we are not responsible for the problem arising from the direct or indirect use of data, either incorrct tanslation or misuse.The original version is:Chinese (Simplified) 。
All languages:English Chinese (Simplified) Chinese (Traditional)
Disclaimer:isheu.com aims to provide an online platform for sharing data, not to infringe the intellectual property rights; if you found the file uploaded by users infringe intellectual property rights, please notify us via Email, we will deal with in a timely manner.
All languages:English Chinese (Simplified) Chinese (Traditional)
Disclaimer:isheu.com aims to provide an online platform for sharing data, not to infringe the intellectual property rights; if you found the file uploaded by users infringe intellectual property rights, please notify us via Email, we will deal with in a timely manner.